Cabinet Refacing & Painting

Millman Services

Cabinet Refacing & Painting

Kitchen and bathroom cabinets that look brand new — without the cost and disruption of a full remodel.

3–5 days typicalDurable factory-smooth finish98% dust-freeVero Beach to Jupiter

Recent work

Refaced white kitchen cabinets with subway tile backsplash in a Treasure Coast condo by Millman Services
Dark espresso-painted kitchen cabinets with stainless appliances refinished by Millman Services on the Treasure Coast
Bright white cabinet refacing in an open-concept Treasure Coast kitchen by Millman Services

What it is

Refacing/painting updates your kitchen or bath by refinishing existing cabinets — new color, new finish, brand-new feel — at a fraction of replacement cost.

When you need it

Cabinets dated or worn but structurally solid; want a new look on a smaller budget; before selling; or a full remodel isn't worth the cost/downtime.

Benefits

  • High-end refreshed kitchen for far less than replacement
  • Smooth, durable, factory-like finish
  • Huge visual impact, minimal disruption
  • Color and finish guidance from start to finish
  • Clean, dust-controlled process protecting counters and floors

Risks of doing it wrong

  • Skipping degrease / sand → finish peels off doors and drawers
  • Wrong products → sticky, soft, or easily-chipped surface
  • Brush-mark-heavy DIY looks worse than the original
  • No dust control spreads sanding dust through the kitchen

What affects the cost

Number of doors/drawers, cabinet condition, reface vs. repaint, finish type, color changes, prep required. Estimated on-site.

How we do it

  1. 1

    Assessment + color/finish selection

  2. 2

    Remove and label doors/hardware; protect counters/floors

  3. 3

    Clean, degrease, sand, prime

  4. 4

    Durable smooth finish coats

  5. 5

    Reinstall, detail, walkthrough

Local considerations

Coastal humidity affects curing and durability — we use products and techniques suited to it, and work cleanly in luxury condos and HOA communities.

Frequently asked questions

Most cabinet projects take 3–5 days depending on size and complexity. Every surface is prepped, sanded, and finished to a smooth, durable result.

Depends on cabinet condition and goals. We'll walk through both on-site and recommend the best value.

Yes — durable finishes and proper prep so doors and drawers resist chips and wear.

Absolutely — we help you choose a color and finish that fits your home.

Give your kitchen a new life at a fraction of the cost.

Serving Vero Beach to Jupiter. Fully insured & HOA-approved.

Call (772) 281-6106Free Estimate